146

Appendix A: System rack installation

Bag of mounting hardware (bushings and screws)

You must also purchase the rack-mount rail kit for the Altos G900 server platform to complete the conversion from tower to a rack- mount configuration.

Figure 57 - Rack-mount kit components

aRack bezel and keys (2)

bRack handle kit - includes handles (2) and screws (4)

cBag of mounting hardware - includes bushings (8) and screws

(8)

Tools and supplies needed

You will need the following tools and supplies to install the contents of this kit:

Phillips (cross-head) screwdriver (#2 bit)

Antistatic wrist strap (recommended)

Note: The Altos G900 chassis is designed to be compatible with the EIA-310-d rack standard. Be sure to select a rack cabinet enclosure that is EIA-310-d compliant.

Equipment rack precautions

Warnings

ANCHOR THE EQUIPMENT RACK: The equipment rack must be anchored to an unmovable support to prevent it from falling over when one or more servers are extended in front of it on slide

Page 162
Image 162
Acer G901 manual Tools and supplies needed, Rack-mount kit components