5-20Configure the Adapter for Direct Connection and Rack Optimization in RSLogix 5000 Software

8.Click OK to continue.

9.Notice the chassis size in the module is modified to 3.

10.Click OK.

At this point, your POINTBus status LED should be solid green. All the yellow triangles in your I/O configuration should be gone.

11.Click OK to close the dialog.

12.Click File>Save to save the project.

Publication 1734-UM011C-EN-P - January 2006

Page 86
Image 86
Bradley Smoker 1734-AENT manual Publication 1734-UM011C-EN-P January