4. Troubleshooting (PROFIBUS DP)

Countermeasure 1: Improve FG.

Grounding Screw

Slave Device

Peel the cable covering and secure the cable with FG clamps.

Isoelectric Line

Grounding Screw

Slave Device

Countermeasure 2: Disconnect the FG wire to isolate it from the ground.

When noise intrudes the ground line because a noise source such as an inverter is installed near the grounding point, disconnect the shield wire of the signal cable and isolate it from the ground to restrain noise intrusion.

Disconnect the grounding wire.

Induced noise via communication cable

Separate the PROFIBUS DP signal wire from the other wires (especially power wires).

* Separate the signal wire from the power wires 300 mm or more.

 

Light electrical cable

Suspended ducts

Floor ducts

 

Communication cable

 

 

 

 

 

 

Signal wire

 

 

1

1

2

 

 

PLC input/output wire

Control cable

PLC power wire Control circuit wire

Power cable

Power wire

 

300 mm

2

 

 

 

or more

 

 

 

 

 

 

 

 

Conduit

 

1 Signal wire

 

 

 

 

 

 

 

 

 

 

300 mm

 

PLC input/output wire

 

1

2

 

or more

2 Power wire

 

 

 

 

 

 

 

 

During site inspection, bypass the wire that is possibly affected by induced noise with other cables and then lay the cables. Establish the communication under no induced noise condition and verify whether an error occurs.

Fieldbus I/O Rev.6

133

Page 145
Image 145
Epson EM07ZS1647F manual Troubleshooting Profibus DP Countermeasure 1 Improve FG