Lincoln Electric 200 service manual 49TROUBLESHOOTING & REPAIRF-49

Models: 200

1 145
Download 145 pages 41.63 Kb
Page 119
Image 119

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

F-49TROUBLESHOOTING & REPAIRF-49

MAIN GENERATOR FRAME REMOVAL AND REPLACEMENT PROCEDURE

WARNING

Service and repair should be performed by only Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.

If for any reason you do not understand the test procedures or are unable to perform the test/repairs safely, contact the Lincoln Electric Service Department for electrical trou- bleshooting assistance before you proceed. Call 1-888-935-3877.

DESCRIPTION

This procedure will aid the technician in the removal and replacement of the main DC generator frame.

MATERIALS NEEDED

Rope sling

Wood or steel blocks

Pry bars

9/16” Wrench

1/2” Wrench

7/16” Wrench

3/4” Wrench

Slot head screw driver

Wiring Diagram

PIPELINER® 200

Page 119
Image 119
Lincoln Electric 200 service manual 49TROUBLESHOOTING & REPAIRF-49, Main Generator Frame Removal and Replacement Procedure