Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

F-59

TROUBLESHOOTING & REPAIR

F-59

MAIN GENERATOR FRAME REMOVAL AND REPLACEMENT PROCEDURE

33.

(CONTINUED)

 

 

Using the rope sling and pry bars, carefully

8.

Carefully position the fuel tank to the mount-

 

lift and “wiggle” the generator frame away

 

ing rails. Using the 9/16” wrench, install the

 

from the engine and armature assembly. Be

 

four nuts, bolts, and washers holding the fuel

 

careful to support the generator frame as

 

tank assembly to the rails. Remove the plug

 

you remove it.

9.

from the fuel line and attach it to the fuel bowl.

NOTE: The exciter frame is also removed with

Perform the

DC Exciter

Armature

the main generator frame.

 

Reassembly Procedure.

 

 

 

10. Carefully set

the top and doors assembly

Reassembly: Refer to Figures F.26 & F.27 as

 

into place. Install the “L” shaped door hooks.

 

Using the 1/2” wrench, install the four nuts

needed.

 

and bolts holding the case top and doors

1.

Using the rope sling, carefully lift and “wiggle”

 

assembly to the welder frame.

Install the

 

the generator frame onto the engine and

 

rubber gasket to the top.

 

 

armature assembly. Be careful to support the

11. Using the 1/2” wrench, install the negative

2.

generator frame as you position it.

 

battery cable. Slide the battery mounting

Using the 9/16” wrench, install the bolts and

 

panel back into place and, using the 7/16”

 

lock washers mounting the generator frame to

 

wrench, install the two bolts and washers

 

the engine. Using the 3/4” wrench, install the

 

that secure the panel.

 

 

frame mounting bolts, nuts, and washers to

 

 

 

 

 

the feet of the main generator. Check air gap

 

 

 

 

 

– min. .035” for main generator.

 

 

 

 

3. Using the 7/16” wrench, tighten the main gen-

 

 

 

 

 

erator brush bracket clamping bolt. Note the

 

 

 

 

4.

position of the drill spot.

 

 

 

 

Install the eight brushes against the main

 

 

 

 

 

commutator. Observe the positions you noted

 

 

 

 

5.

during disassembly.

 

 

 

 

Using the slot head screw driver, install the

 

 

 

 

 

brush bracket wrap-around cover with two

 

 

 

 

6.

nuts and screws.

 

 

 

 

Carefully set the front panel assembly into

 

 

 

 

 

position. Using the 3/8” nut driver, install the

 

 

 

 

 

screw for the lower middle of the front panel.

 

 

 

 

 

Using the 9/16” wrench, install the four bolts,

 

 

 

 

 

nuts, and washers for the bottom of the front

 

 

 

 

 

panel assembly. Then install the two bolts,

 

 

 

 

 

nuts, and washers that hold the front panel

 

 

 

 

 

assembly to the horizontal rails.

 

 

 

 

7. Reconnect all leads previously removed. See the Wiring Diagram.

PIPELINER® 200

Page 129
Image 129
Lincoln Electric 200 service manual Main Generator Frame Removal and Replacement Procedure