Nortel Networks 400 4.0, BCM200 manual Install a new cable clamp

Models: 400 4.0 BCM200

1 382
Download 382 pages 50.71 Kb
Page 292
Image 292

292Chapter 23 Replacing or upgrading a power supply

Figure 153 Install a new cable clamp

 

P3

P2

Auxiliary

 

 

Mount new cable

 

clamp - located

 

on underside of

 

cover

 

Cable clamp - located

 

on top of power supply

18Run the power supply, auxiliary, and IDE cables to the hard disk. Secure these cables in the new cable clamp.

Note: Verify the power supply cables are connected correctly and are routed so they do not interfere with any internal components when moved.

19Connect cable runs P2 and P3 to the media bay backplane (see Figure 153) as follows:

a Bundle the cables together. Run the cables on the top of the power supply chassis and secure with the cable clamp.

b Connect cable P2 into the bottom media bay module backplane power connector. c Connect cable P3 into the top media bay module backplane connector.

d Bundle power cables P2 and P3 along with auxiliary cable (P7 or P8) together with a grommet (see Figure 154).

e Insert the P2, P3, and auxiliary cable into the cable slot on the chassis (secured with the grommet).

f Ensure that one power run connects to one MBM backplane connector. Do not connect a single power run to both MBM backplane connectors.

N0060612

Page 292
Image 292
Nortel Networks 400 4.0, BCM200 manual Install a new cable clamp