53
Table-top Stand: PDK-5001
4.4.4 Assembling the stand
1) Assembling Procedure 1
1Place the base upside-down.
2Insert the left and right stand pipes into the base.
(CAUTION : Insert pipes so that they face in the proper direction.)
3Fasten the pipes to the base with the supplied screws.
(Tighten the central screws first.)
Stand pipe, L
2) Assembly procedure 2
1Align the vertical pipe with openings in the left and right stand pipes.
2Tighten bolts with the supplied hexagonal wrench to secure the vertical pipe.
3Insert caps into the openings in the left and right stand pipes.
Screw (4 x 12)
Screw (4 x 12)
* Insert the pipe so that the
larger openings face outward.
Base
Vertical pipe
Hole
Bolt (M6 x 40)
Bolt (M6 x 40)
Cap
Cap
Hexagonal
wrench
* Tighten these screws first.
Stand pipe, R