Phase | 1: | Installation | and | Power | Problems |
|
|
|
|
|
| |
This | section | describes | the | troubleshooting operations | for | problems | that | occur after you | ||||
turn | ON the ONcore hub and wait for the 6416SW ACTIVE LED | to light | ON | (yellow). | ||||||||
“Verifying Normal 6416SW Operation” on page | describes the | other | LED | conditions. | ||||||||
Phase | 1 problems | concern | the | installation tasks | described | in | Chapter 2, | “Installation” | ||||
on page |
|
|
|
|
|
| ||||||
Prerequisites | for diagnosing normal | operation | of the | ATM | subsystem. |
|
Problems indicated by the ATM media LEDs
Problems indicated by the 6416SW LEDs
Power supply problems.
After solving | Phase 1 problems, | the | 6416SW | ACTIVE LED | lights ON (yellow). A yellow | ||||
ACTIVE LED | indicates | that | the | 6416SW | module | is ready to control the ATM subsystem | |||
and | that | you | can | begin | configuring | the ATM | subsystem in the ONcore hub as described | ||
in | Chapter 5, | “Configuring | the ATM | Switch/Control | Module” | on page |