Phase

1:

Installation

and

Power

Problems

 

 

 

 

 

 

This

section

describes

the

troubleshooting operations

for

problems

that

occur after you

turn

ON the ONcore hub and wait for the 6416SW ACTIVE LED

to light

ON

(yellow).

“Verifying Normal 6416SW Operation” on page 2-7

describes the

other

LED

conditions.

Phase

1 problems

concern

the

installation tasks

described

in

Chapter 2,

“Installation”

on page 2-1 and are divided as follows:

 

 

 

 

 

 

Prerequisites

for diagnosing normal

operation

of the

ATM

subsystem.

 

Problems indicated by the ATM media LEDs

Problems indicated by the 6416SW LEDs

Power supply problems.

After solving

Phase 1 problems,

the

6416SW

ACTIVE LED

lights ON (yellow). A yellow

ACTIVE LED

indicates

that

the

6416SW

module

is ready to control the ATM subsystem

and

that

you

can

begin

configuring

the ATM

subsystem in the ONcore hub as described

in

Chapter 5,

“Configuring

the ATM

Switch/Control

Module”

on page 5-1.

7-2 ONcore ATM Switch/Control Module: Installation and User's Guide

Page 132
Image 132
3Com 6416SW manual Phase, Active LED