Phase | 4: | Problems | with | Normal |
| ATM | Operation |
|
|
|
|
|
| ||||||
The | problems | in | this | phase occur after ATM traffic is started in the network between | |||||||||||||||
ATM | devices | attached to ATM media ports. The | ATM portOKAY. status is |
|
| ||||||||||||||
Important: |
| Problems in | the normal operation of your | ATM | subnetwork | may occur |
| ||||||||||||
when the | maximum | number of | virtual | connections | (VCs) | allowed | on | a | ONcore hub | or | |||||||||
an individual ATM media module is exceeded. The maximum number of virtual |
| ||||||||||||||||||
connections | supported | is | as | follows: |
|
|
|
|
|
|
|
|
| ||||||
| 3000 | per | ONcore | hub |
|
|
|
|
|
|
|
|
|
|
|
|
| ||
| 992 | per | ATM | media module | (with | up to | 992 | VCs per ATM media port). |
| ||||||||||
The | aim | of | the | troubleshooting | operations | in | Phase | 4 | is | to | restore normal | operation to | |||||||
the | network | so | that | ATM | traffic | can | continue. |
|
|
|
|
|
|
| |||||
If you cannot solve the problem after performing the troubleshooting operations | |||||||||||||||||||
described | in this | section, | contact | your | 3Com | service representative. |
|