Other Problems
Cannot create a | PVC between two ONcore | hub/CELLplex 4000s | located | in | |
different | clusters. |
|
|
| |
Explanation: |
|
|
|
| |
This is normal. The ONcore | hub/CELLplex | 4000 | does not allow the creation of | ||
PVCs | over | (NNI) links. |
|
|
You have created two different PVCs, each one ending at the NNI port.
Note: | Make | sure | that the | VPI | used | by | the | PVC | on | the NNI port corresponds to the | ||||||||||||
one | of | the | logical | link | defined | on | that | port. |
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
| ||||||||||||||
ATM | fail: | frames are lost. | clients |
|
|
|
| |||||||||||||||
located behind a | ATM | server, but | the |
|
|
|
|
| ||||||||||||||
applications/sessions | keep | failing, | while |
| clients | connected | directly | to | ATM | have |
|
|
|
| ||||||||
no problems. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Explanation: |
| The | frame | size |
| on | the | ATM | server | is | larger | than | the | maximum frame | ||||||||
size allowed by the bridge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
Steps to | Take: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Change | the | MAX_FRAME_SIZE |
| on | the | ATM | server | to | the | maximum | value | allowed | ||||||||||
by the bridge (8281 max | frame | size | should | be | 8939 | bytes). |
| |||||||||||||||
Note: | You | may | have | to | change | the | MAXDATARCV | parameter | of | the | OS/2 | |||||||||||
| NETBIOS clients | to | 4168 | in | the |
| PROTOCOL.INI | file. |
|
|
|
ONcore hub/CELLplex 4000 Terminal/Telnet very slow or Ping to ONcore hub/CELLplex 4000 very slow.
Explanation: The ONcore hub/CELLplex 4000 is congested by Signalling Calls.
Steps to Take:
1. If | you | cannot be in | front of the ONcore hub/CELLplex | 4000, | perform a remote | login |
using | Telnet. First make | sure that the trace is not active, | then disable the | ports | ||
ATM Switch/Control | Module: Installation and User's | Guide |
|
|