Phase | 3: | Problems | on | ATM | Media | Ports | Without |
|
|
|
|
|
|
| |||||||
ATM | Traffic |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
The | problems | in | this | phase | occur | after | the | status | ofNO ACTIVITYall ATM media | ports | is | ||||||||||
and | ATM devices | have | been | attached | to | ATM media | ports. No | ATM | traffic | is | started in | ||||||||||
the | hub. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Phase 3 problems occur because | one | or | more ATM media ports are not functioning | ||||||||||||||||||
properly. The | aim | of | the troubleshooting | operations |
| in this phase is to: |
| ||||||||||||||
Change | the | status | of | all | ATM | mediaOKAYports(as toshown |
| with | the | SHOW PORT |
|
| |||||||||
command) | so | that | ATM | traffic | can be started | in | the | hub. |
|
|
| ||||||||||
Correct | errors | in | ATM | address | registration | between ATM | media | ports | and | attached | |||||||||||
ATM | devices, | unless | a | device |
| is | operating | in | PVC | mode. |
|
|
|
|
Phase 3 problems are divided as follows:
Problems concerning ATM media ports that are attached to ATM devices
Problems with ATM address registration
Problems concerning the hardware environment.
If you cannot solve the problem and if ATM media port statusOKAY, does not change to contact an 3Com service representative before starting ATM traffic.