Contents

Business Schedules

2-14

Holiday Schedules

2-16

3

Implementing the Integration

3-1

 

Hardware Platform Installation

3-1

 

Hardware Platform Connection

3-1

 

Completing the Software Installation

3-2

 

MERLIN LEGEND Initial Administration

3-2

 

Intuity System Initial Administration

3-3

 

 

Perform Acceptance Testing

3-5

 

Administer and Test

 

 

 

Optional Intuity Packages

3-6

 

Administer Automated Attendant Enhancements

3-6

Administer MERLIN LEGEND System

for Cut-to-Service

3-7

Administer Networking

3-8

4

Connectivity

4-1

 

MERLIN LEGEND

 

 

 

Voice Port Requirements

4-2

 

Intuity System Connections

4-3

 

 

IVC6 Connections

4-3

 

 

Connect IVC6 Boards Using 885A Adapter:

4-3

 

 

Connect IVC6 Boards

 

 

 

Using 104A Connecting Blocks:

4-4

 

 

Connecting Serial Ports

4-5

 

 

Connecting Administration Ports

 

 

 

Within 50 feet, Same Power Outlet

4-6

 

 

Connect Admin Ports

 

 

 

More Than 50 feet/Different Power Outlet

4-7

 

 

Connecting SMDR Ports

 

 

 

Within 50 feet, Same Power Outlet

4-11

 

 

Connecting to Serial Port 2 (COM2)

4-11

Issue 2.0 December 1995 vii

Page 4
Image 4
AT&T 585-310-231 manual Implementing the Integration