Extreme Networks 17001 manual Safety Information, Considerations Before Installing

Models: 17001

1 274
Download 274 pages 9.67 Kb
Page 215
Image 215

A Safety Information

WARNING!

Read the following safety information thoroughly before installing Extreme Networks products. Failure to follow this safety information can lead to personal injury or damage to the equipment.

Only trained service personnel should perform service to Extreme Networks switches and their components. Trained service personnel have read all related installation manuals, have the technical training and experience necessary to be aware of the hazards to which they are exposed in performing a task, and are aware of measures to minimize the danger to themselves or other persons.

This appendix includes the following sections:

Considerations Before Installing on page 215

Installing External Power Supply Units on page 216

Maintenance Safety on page 217

General Safety Precautions on page 217

Cable Routing for LAN Systems on page 217

Selecting Power Supply Cords on page 218

Battery Replacement and Disposal on page 219

Fiber Optic Ports—Optical Safety on page 219

Considerations Before Installing

Consider the following items before installing equipment.

The system is designed to operate in a typical environmentally controlled Telco environment. Choose an indoor area that has the following characteristics:

Temperature- and humidity-controlled, such that the maximum ambient room temperature shall not exceed 40ºC (104ºF)

Clean and free from airborne materials that can conduct electricity

Well ventilated and away from sources of heat including direct sunlight

Away from sources of vibration or physical shock

Isolated from strong electromagnetic fields produced by electrical devices

Secured, enclosed, and restricted-access, ensuring that only trained and qualified service personnel have access to the equipment

Establish at least 3 inches clearance on all sides for effective ventilation. Do not obstruct the air intake vent on the front, side, or rear ventilation grills. Locate the system away from heat sources.

Make sure that your equipment is placed in an area that accommodates the power consumption and component heat dissipation specifications.

Make sure that your power supplies meet the site power or AC power requirements of the all network equipment.

Summit Family Switches Hardware Installation Guide

215

 

 

Page 215
Image 215
Extreme Networks 17001 manual Safety Information, Considerations Before Installing