Extreme Networks 17001 Installing a Summit X480 Series Switch, Pre-installation Requirements

Models: 17001

1 274
Download 274 pages 9.67 Kb
Page 127
Image 127

CAUTION

Be sure that proper ESD controls are in use before switch maintenance is performed. This includes but is not limited to wrist straps that are grounded to the switch chassis and earth grounds.

To remove a DC-powered Summit switch from an equipment rack:

1De-energize the DC circuit for all power connections.

2Loosen the retainer nut and unplug the DC power connector from the DC power socket on the rear of the switch.

3Disconnect the Summit switch from the redundant power supply (if applicable).

4At the back of the switch, loosen the retaining screw on the ground lug and pull the ground wire out of the lug. Move the ground wire out of the way.

5Loosen and remove the four rack system mount screws holding the switch in place against the system rack.

6Carefully remove the switch from the rack and place it on a secure, flat surface.

WARNING!

Removing the DC wiring harness from your facilities DC source voltage requires the performance of a qualified, licensed electrician.

Installing a Summit X480 Series Switch

The Summit X480 series switch fits into a standard 19-inch equipment rack. The provided rack-mounting brackets are adaptable to either two-post or four-post mounting.

The installation process includes the following tasks:

1Install the switch in the rack.

2Install one or two power supplies and connect power cables.

3Connect network interface cables.

If you are installing Summit X480 series switches for use in a SummitStack configuration, read Chapter 2, “Building a SummitStack Configuration,” before you install the switches.

NOTE

Take care to load the rack so that it is not top-heavy. Start installing equipment at the bottom and work up.

Pre-installation Requirements

Installing the Summit X480 switch requires two people to maneuver the switch and attach mounting hardware.

To allow safe handling of the switch during the installation process, make sure you have the following available space around the rack:

Back: Minimum 30 inches behind the rack posts.

Summit Family Switches Hardware Installation Guide

127

 

 

Page 127
Image 127
Extreme Networks 17001 manual Installing a Summit X480 Series Switch, Pre-installation Requirements