•Include backup details - To obtain the latest backup information, select the Include backup details option, and schedule the discovery to run nightly after you run your backup sessions. It is recommended you do not schedule the discovery of infrastructure details and backup details to run at the same time.
This section contains the following topics:
•Adding a Discovery Schedule, page 182
•Disabling a Schedule, page 183
•Removing a Schedule, page 184
•Modifying Collector Settings for Newly Discovered Elements, page 184
Adding a Discovery Schedule
Schedule getting details when the network is not busy.
Keep in mind the following:
•All collectors are stopped during a discovery using the Include infrastructure details option. This means that during the gathering of infrastructure details, information about the SAN, such as for Performance Manager, is not updated.
•If you are creating multiple discovery schedules, take care to avoid scheduling
•Do not run Discovery Data Collection for all discovery groups simultaneously.
•Hosts discovered with CIM extensions from Build 5.1 and later of the HP Storage Essentials cannot be added to discovery groups. These hosts can be placed independently into scheduled Discovery Data Collection tasks without being part of a discovery group. This allows you greater flexibility when gathering discovery data.
If you are upgrading from a previous build of the product, and you rediscover your hosts, they will be moved out of their existing discovery groups. Each rediscovered host would be placed in its own discovery group. If the original discovery groups containing these hosts were included in scheduled Discovery Data Collection tasks, the schedules would be modified to contain the new discovery groups for rediscovered hosts.
To schedule discovery details:
1.Select Options > Storage Essentials > Discovery > Schedule Discovery Data Collection.
2.Click New Schedule.
3.In the Name box, enter a name for your discovery schedule.
4.In the Description box, enter a description for your discovery schedule.
5.Select one or more of the following:
•Include infrastructure details - If the Include infrastructure details option is selected, the management server gathers detailed information about the SAN infrastructure. This process can be network intensive.
182 Configuring the Management Server