
To add an
1.Access Reporter as described in ”Accessing Reporter” on page 435.
2.Expand the tree in the middle pane, and click the report you want to send at a scheduled time.
3.When the report is displayed in the right pane, click the Scheduled Deliveries tab in the right pane.
4.Click Add
5.Verify that the Properties tab is displayed.
6.In the top box, enter the recipient's
The software verifies the address entered has a correct form. To send multiple addresses, separate each address with a comma (,); for example:
john.example@appiq.com,jerry.example@appiq.com
7.In the Subject box, enter a subject for the
NOTE: Provide the name of the report in the Subject box so users can distinguish the message from others.
8.In the Message box, enter a message describing the report.
If you are
This
9.From the Format menu, select one of the following formats:
•PDF - Requires the use of Adobe Acrobat, which can be downloaded for free from http://www.adobe.com.
•Excel - Requires the use of Microsoft Excel.
•XML - Requires that the user has an understanding of XML.
10.(Any report having a date parameter) From the Include Data for the Last menu, select the period of time you want displayed in the report.
11.In the Time to Run box, enter the time you want to send the report in the
12.Select one of the following options to determine how frequently you want to send the report:
•Daily - If you selected daily, select how frequently you want the management server to send the report:
•Everyday - The report is sent everyday.
•Weekday - The report is sent only Monday through Friday.
•Every x days - Enter how frequently (in days) you want the report to be sent. For example, if you enter 15, the report is sent every 15 days.
•Weekly - If you select Weekly, use the Frequency menu to select the day of the week on which you want the report sent.
HP Storage Essentials SRM 6.0 User Guide 441