2.Select the element you want to monitor.
3.Under the Monitoring tab in the
4.In the pane under the tree, select a monitoring option.
See ”Monitoring Options” on page 401 for more information.
5.Use the Chart and Unit combo box to modify the chart. When you are done with your
selections, click the button in the lower pane. To learn more about these features, see ”The Toolbars in Performance Manager” on page 395
6.To monitor more than one element in a chart, see ”Comparing the Performance of Different Elements” on page 398.
The Toolbars in Performance ManagerPerformance Manager provides two toolbars, one in the upper pane and another in the lower pane. The toolbar in the upper pane is the same as the one in System Manager. See ”The Toolbar in System Manager” on page 252 for information about the toolbar in the upper pane.
The toolbar in the lower pane provides the following information:
Table 55 Toolbar in Lower Pane of Performance Manager
Icon | Description |
|
|
| |
| Saves the graph in three formats: HTML, XLS, CSV. | |
|
|
|
| Lets you print a graph. |
|
|
| |
| Clears the graph of the elements you have selected. | |
|
| |
| Lets you determine the type of graph displayed. Select one of the | |
| following options, and then click the | button: |
| • Bar - Displays each data point as a bar. The data for the different | |
| elements is displayed side by side. |
|
| • Line - Displays each data point as a dot with a line connected to the | |
| previous data points. The data for the different elements for a specific | |
| point in time is displayed in the same column. | |
| • Summary - Displays a single line that summarizes the values for a | |
| single statistic. Multiple statistics can be shown with multiple lines. | |
| ||
|
|
|
HP Storage Essentials SRM 6.0 User Guide 395