Testing the Setup
The following is a sample testing procedure to ensure your setup is working.
These tests include communicating with the server operating system. Before you
start, ensure that the necessary serial port(s) is configured. If you need assistance refer to “Serial Port Configuration” on page 176.
The server should be powered off as a result of the “Service Processor Setup Checklist” on page 173.
Testing Call-In
1.Go to your remote terminal and call in to your server. Your server answers and offers you the Service Processor Main Menu after requesting your privileged access password.
2. | SelectSystem |
| Power | Control | . |
|
|
|
|
|
|
|
|
|
|
| |||
3. |
| System | . |
|
|
|
|
|
|
|
|
|
|
|
| ||||
When | you | are | asked | if | you | wish to continue poweringY.on the system, type | |||||||||||||
4. | After | the | system firmware and operating system have initialized the server, the | ||||||||||||||||
login | prompt | displays | at | your | remote | terminal | if | you set | up | Seamless | Modem | ||||||||
Transfer | (refer | to page 183 for more | information). This | may | take several | ||||||||||||||
minutes. | When the | login prompt | displays, you | have | successfully | called | the | ||||||||||||
Service | Processor. |
|
|
|
|
|
|
|
|
|
|
|
|
| |||||
5. Typelogout |
|
| to | disconnect | from | the operating system.No TheCarriermessage |
| ||||||||||||
displays | on | your | remote | terminal. |
|
|
|
|
|
|
| ||||||||
6. | Call | your | server | again. | The | operating | system answers and offers you the login | ||||||||||||
prompt. If | these | tests | are | successful, | is working. |
|
| ||||||||||||
7. | Log | in | and | typeshutdown | to | shut | down | your | server. |
|
|
| |||||||
8. | The | messageNo Carrier | displays | on | your | remote | terminal. |
|
|
|
174 RS/6000 Enterprise Server Model H80 Series User's Guide