Administering the Switch for CMS High Availability Systems
CentreVu
CMS R3V8 High Availability
Connectivity, Upgrade and Administration
Administering the Definity Switch 4-7
forms, with detailed explanations for the required fields. Use the forms in
the order shown.
To enable the HA option, you must administer a link from one C-
LAN circuit pack to one CMS computer, and a second link from a
different C-LAN circuit pack to another CMS computer.
Form Purpose
change node-names Adding node names and IP
addresses
change ip-interfaces Adding a C-LAN IP interface
add data-module (this form has
been changed in R8) Adding an ethernet data module
change communication-interface
processor-channels Adding the processor interface
channels
add ip-route (this form has been
changed in R8) Adding IP routes (if needed)
NOTE: