UNIT/CIRCUIT CARD REPLACEMENT PROCEDURE

5. CPR Cooling Fan Replacement

This section explains how to replace a cooling fan in the back side of the CPR. This procedure is necessary when a fault is detected in the cooling fan. Because the fan is a vital device to protect the CPR from heated air, it is also recommended that the fan be replaced at least every two years, even if a fault is not detected.

STEP 1 Set the CPU, whose rack houses the fan to be replaced, in STBY mode via the MBR key on the DSP (Refer to Figure 4-24.) Note

Note: For the ACT/STBY changeover of the CPU, see Chapter 6.

STEP 2 Disconnect the power alarm cable from the PALM connector on PZ-PW92.

STEP 3 Turn OFF the PWR SW on the PZ-PW92 (Refer to Figure 4-24Face Layout of CPR.)

PZ-IO27

PZ-GT16 and PZ-GT13 (ISAGT)

Note

 

SW

O N

O F F

5A

O U T PW R

IN PW R

H D D M B

C PUO PE W D T

IM G 0

 

F DD

M B R

 

 

 

IM G 1

IMG 2

IM G 3

 

SYSTEM SELEC T0

STATU S

1

2

3

4

 

 

 

 

O N

 

 

 

 

 

 

 

 

 

 

OFF

 

 

 

 

 

 

 

 

 

 

 

 

SYSTEM SELEC T1

 

 

 

 

 

 

 

1

2

3

4

5

6

7

8

 

 

 

 

 

 

 

 

 

 

 

 

 

O N

 

 

 

 

 

 

 

 

SEN SE

 

 

 

 

 

 

 

 

OFF

 

 

 

 

 

 

 

2

46

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PAL M

 

 

 

 

 

 

 

 

 

 

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E C

 

 

 

 

 

 

 

 

 

SYSTEM SELEC T2

 

A

 

 

 

 

 

 

 

CP U R ST

 

 

 

 

 

O N

 

 

 

 

 

 

 

 

 

 

O N

 

 

 

 

 

 

 

OFF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O F F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLO T No.

0

1

2

3

4

5

6

PZ-PW92

 

PZ-PC19 (LANI)

 

 

 

Note: In place of PZ-IO27, the CPR may be equipped with PZ-IO28, which does not have the MB (Make- busy) key.

Figure 4-24 CPR Face Layout

STEP 4 Disconnect the power and bus and ether cables from the relevant connectors.

Power cables from OUTPWR, INPWR connectors on PZ-PW92

Bus cables from the front connectors on PZ-GT13 and PZ-GT16

Ether (UTP CTG5 ST CA-n) cables from the front connectors on the PZ-PC19.

STEP 5 Remove the front bracket, and then take off the four screws fastened onto the CPU. (Refer to Figure 4-25.)

STEP 6 Extract the CPR from the LPM. (Refer to Figure 4-25.)

NDA-24300CHAPTER 4

Page 301

Issue 1

Page 328
Image 328
NEC NDA-24300 manual CPR Cooling Fan Replacement, PZ-IO27 PZ-GT16 and PZ-GT13 Isagt