SYSTEM OPERATIONS

10.1 Designated Connection Test (Station)

(1)General

The purpose of this test is to confirm the operations related to a trunk or tone that is designated from the test station. Refer to Table 6-6. The test result displays on the MAT screen as system message [6-I].

Table 6-6 Designated Connection Test (Station) Operations

ITEM

TEST ITEM

CONTENT OF CONFIRMATION

REMARKS

 

 

 

 

1

Register (ORT/IRT)

Whether the dialed numbers (1, 2, 3, 4, 5, 6, 7, 8, 9, 0, *, #) can be

 

 

 

received correctly is to be confirmed.

 

 

 

 

 

2

Sender

Whether the numbers (1, 2, 3, 4, 5, 6, 7, 8, 9, 0, *, #) can all be sent out

 

 

 

is to be confirmed.

 

 

 

 

 

3

3-Party Conference

By connecting the test tone to each port of a 3-Party Conference Trunk,

 

 

Trunk

whether the test tone can be heard is to be confirmed.

 

 

 

 

 

4

Tone

Various kinds of tone are to be confirmed.

 

 

 

 

 

5

Interrupted Ringing

Interrupt ringing (IR) is to be confirmed.

 

 

(IR)

 

 

 

 

 

 

6

Trunk

Connections of trunks are to be confirmed.

 

 

 

 

 

(2)Precaution

Designated connection to a trunk—A designated connection to trunk is limited only to an individual line of either 2nd DT system or sender system.

NDA-24300CHAPTER 6

Page 439

Issue 1

Page 466
Image 466
NEC NDA-24300 manual Designated Connection Test Station, Test Item Content of Confirmation Remarks