NEC NDA-24300 manual System Initialization by Sinz Command

Models: NDA-24300

1 653
Download 653 pages 50.84 Kb
Page 512
Image 512

SYSTEM OPERATIONS

12.2.5System Initialization by SINZ Command

The entire system can be initialized by execution of the SINZ command from the MAT, which is useful for maintenance technicians who have to control the system from a distant location. Perform the pro- cedure in Table 6-18.

Table 6-18 System Initialization by SINZ Command Procedure

ACTION

REMARKS

START

 

 

 

For information about SINZ

 

 

Use SINZ command to execute

command, see Chapter 8.

initialization.

 

 

 

 

Execution of Initialization

Confirm the following lamp indications:

When the initialization com-

pletes, ACT0 lamp lights

[CPU DSP #0]

CPU OPE: steady-green

green and ACT1 lamp goes

 

IMG0-3:

flash (green)

OFF on EMA (PH-PC40)

[CPU DSP #1]

IMG0:

flash (green)

card.

Use ATIM command to adjust date and

Note: When the system is

time.

initialized, the MAT is

 

 

once disconnected. Then,

 

 

 

 

log in to system again.

END

 

NDA-24300CHAPTER 6

Page 485

Issue 1

Page 512
Image 512
NEC NDA-24300 manual System Initialization by Sinz Command