SYSTEM OPERATIONS

Table 6-20 Start-Up When Basic & Application Software Is

Installed [Procedure #1] (Continued)

ACTION

7SEG LED/OPE LAMP/KEY

SETTINGS

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Set SENSE switch at “2” (DM Load Restart) on the DSP of active

ATTENTION

 

CPU.

 

 

 

Contents

 

 

 

 

Static Sensitive

 

 

 

 

 

 

 

 

Handling

 

 

 

 

Precautions Required

 

 

 

 

 

 

 

 

 

 

 

 

 

Enter your Office Data.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Back up Office Data using the MEM_HDD command.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Turn ON the EFFECT key on the TOPU. (See Figure 6-58)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Set the keys on the TOPU as follows.

 

 

SYSTEM DATA

PROGRM

• PROGRAM KEY

NON LOAD

 

 

NON LOAD

LOAD

 

 

 

 

 

 

 

• SYSTEM DATA KEY

LOAD

 

 

LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NON LOAD

 

 

 

 

 

 

 

 

PZ-DK222

Press INITIAL START button on the TOPU.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CPU OPE and IMGX lamps on

 

 

 

 

 

 

 

 

both DSP go OFF.

 

 

 

• HD Initial

STATUS LED (right) on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the DSP of CPU is ON.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• DM Load

STATUS LED (right) on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• System Initial

the DSP of CPU is ON.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STATUS LED (right) on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• System starts up again.

the DSP of CPU is ON.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CPU OPE lamp on the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DSP of active CPU

 

 

 

 

lights steady-green. IMG0-3

 

 

 

 

lamps flash.

 

 

 

 

IMG0 lamp on the DSP of mate

 

 

 

 

CPU flashes green.

 

 

 

 

STATUS LED (right) on

 

 

 

END

 

the DSP of CPU is ON.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(ON LINE)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NDA-24300CHAPTER 6

Page 491

Issue 1

Page 518
Image 518
NEC NDA-24300 manual Set Sense switch at 2 DM Load Restart on the DSP of active, Cpu