NEC NDA-24300 manual Active CPU light steadily green, System Data KEY → NON Load

Models: NDA-24300

1 653
Download 653 pages 50.84 Kb
Page 510
Image 510

 

 

 

 

 

 

 

 

SYSTEM OPERATIONS

 

 

 

Table 6-16

System Initialization by Phase 1 Restart [Procedure #5]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACTION

7SEG LED/OPE LAMP/KEY

 

 

 

 

SETTINGS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CPU OPE lamp on the DSP of

 

 

 

 

START

active CPU light steadily green.

 

 

 

 

 

 

 

 

(IMG0-3 lamps flash.)

 

 

 

 

 

 

 

 

 

 

 

Confirm system is operating normally.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IMG0 lamp on the DSP of mate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Set the SENSE switch on the DSP of CPR to “3”.

 

 

 

 

 

 

 

 

 

 

CPU flashes green.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Turn ON the EFFECT key on the TOPU. (See Figure 6-58)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SYSTEM DATA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROGRM

 

 

 

Set the keys on the TOPU as follows.

 

 

 

 

 

 

 

NON LOAD

 

 

 

 

 

LOAD

 

 

 

 

 

 

 

 

 

 

 

• PROGRAM KEY

NON LOAD

 

 

 

 

LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• SYSTEM DATA KEY

NON LOAD

 

NON LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PZ-DK222

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Press INITIAL START button on the TOPU.

 

CPU OPE and IMGX lamps on

 

 

 

 

 

 

 

 

both DSP go OFF.

 

 

 

 

 

 

 

 

 

 

 

 

 

• HD Initialization

STATUS LED (right) on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the CPU is ON.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• System Initialization

STATUS LED (right) on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• System starts up again.

the DSP of CPU is ON.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CPU OPE lamp on the DSP of

 

 

 

 

 

 

 

 

active CPU lights steady green.

 

 

 

 

 

 

 

 

(IMG0-3 lamps flash.)

 

 

 

 

 

 

 

 

IMG0 lamp on the DSP of mate

 

 

 

 

 

 

 

 

CPU flashes green.

 

 

 

 

 

 

 

 

STATUS LED (right) on

 

 

 

 

 

 

 

 

 

 

 

 

 

the DSP of active CPU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

is ON. (ON LINE)

 

 

 

 

 

 

 

 

 

END

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NDA-24300CHAPTER 6

Page 483

Issue 1

Page 510
Image 510
NEC NDA-24300 manual Active CPU light steadily green, System Data KEY → NON Load