ROUTINE MAINTENANCE PROCEDURE

2.ROUTINE MAINTENANCE PROCEDURES

This section explains general routine maintenance procedures to be performed on a daily, monthly, and quar- terly basis. Table 7-2lists each procedure according to the time each procedure is to be performed. Use the Reference Section to locate the detailed procedure.

Table 7-2 List of Routine Maintenance Procedures

TIME

PROCEDURE

REFERENCE SECTION

REMARKS

 

 

 

 

Daily

Check the temperature and relative humidity in

Section 2.1, Ambient Conditions

 

 

the switch room.

in Switch Room Check

 

 

 

 

 

 

Check to see if any of the alarm indicator lamps

Section 2.2, Alarm Check

 

 

on the TOPU are lit.

 

 

 

 

 

 

 

Check the operating status of the MAT and the

Section 2.3, MAT/Printer Check

 

 

printer, remaining quantity of paper, etc.

 

 

 

 

 

 

 

Check to see if a system message indicating a

Section 2.4, Collection of Sys-

 

 

fault is displayed.

tem Messages

 

 

 

 

 

 

Check whether any station is in lockout state.

Section 2.5, Display of Locked-

 

 

 

out Station

 

 

 

 

 

 

Check whether the FANU is operating normally.

Section 2.6, Fan Unit Check

 

 

 

 

 

Monthly

Generate an alarm and check whether an indica-

Section 2.7, Alarm Tests

 

 

tion appears on the TOPU.

 

 

 

 

 

 

 

Check the conditions of the rectifier and batteries.

Section 2.8, Main Power System

 

 

 

Check

 

 

 

 

 

 

Check trunk circuits individually. Also check the

Section 2.9, Trunk RGU Check

 

 

RGU circuit in the PWR Supply of each

 

 

 

Module.

 

 

 

 

 

 

 

Check each operation and lamps of DESKCON/

Section 2.10, ATTCON/

 

 

ATTCON.

DESKCON Check

 

 

 

 

 

Quarterly

Check the CPU, TSW, and line/trunk Port Micro-

Section 2.11, System Check

 

 

processors (PMs).

 

 

 

 

 

 

NDA-24300CHAPTER 7

Page 497

Issue 1

Page 524
Image 524
NEC NDA-24300 manual Routine Maintenance Procedures, Time Procedure Reference Section Remarks