
|
|
| Contents |
Chapter 3 - Commissioning | 69 | ||
3.1 | Configuring Basic Parameters | 70 | |
| 3.1.1 | Initial Configuration | 70 |
| 3.1.2 | Country Code Selection | 72 |
| 3.1.3 Transmit Power Compliance With Regulations | 73 | |
3.2 | Using the Optional | 75 | |
3.3 | Aligning the Subscriber Unit Antenna | 76 | |
3.4 | Configuring the Subscriber Unit’s Maximum Modulation Level | 78 | |
3.5 | Operation Verification | 80 | |
| 3.5.1 | Outdoor Unit Verification | 80 |
| 3.5.2 | Indoor Unit Verification | 83 |
| 3.5.3 | 84 | |
| 3.5.4 Verifying the Ethernet Connection (Modular Base station) | 86 | |
| 3.5.5 Verifying the | 86 | |
| 3.5.6 | Verifying Data Connectivity | 86 |
Chapter 4 - Operation and Administration | 87 | ||
4.1 | Working with the Monitor Program | 88 | |
| 4.1.1 Accessing the Monitor Program Using Telnet | 88 | |
| 4.1.2 | Common Operations | 89 |
4.2 | Menus and Parameters | 91 | |
| 4.2.1 | Main Menu | 91 |
| 4.2.2 | Info Screens Menu | 91 |
| 4.2.3 | Unit Control Menu | 96 |
| 4.2.4 | Basic Configuration Menu | 111 |
| 4.2.5 | Site Survey Menu | 113 |
| 4.2.6 | Advanced Configuration Menu | 128 |
BreezeACCESS VL System Manual
xxv