3-94

Section 3 - Operation

Wheel Installation - Triple

5

 

6

F3-129

Triple Wheel Configuration

NOTE: Install the wheels so that both center and outer treads face the same direction.

g.Install the twenty cap screws (6), washers and nuts through the wheel rims.. Torque the nuts to 710 N·m (525 ft-lbs)..

NOTE: The drums on the center and outer wheels have large cutouts in them to assist in installing the drum hardware.

h.Repeat the above procedure for the other three sets of triple wheels..

i.Drive the tractor, steering from lock to lock.. Park the tractor and recheck the torques on the inner and outer wheel nuts as detailed in Steps e and g..

435/485/535

Page 123
Image 123
Buhler 485, 535, 435 manual Operation Wheel Installation Triple