3: Installation

This chapter provides a high-level procedure for installing the SLB branch office manager followed by more detailed information about the SLB connections and power supplies.

Caution: To avoid physical and electrical hazards, please be sure to read

C:Safety Information before installing the SLB device.

What’s in the Box

In addition to the SLB branch office manager, the box contains the following items:

Part #

Component Description

Adapters:

200.2066A

Adapter: DB25M (DCE), Sun w/DB25 female

 

 

200.2067A

Adapter: DB25F (DCE) to RJ45, Sun w/DB25 male and some

 

HP9000’s

 

 

200.2069A

Adapter: DB9M (DCE) to RJ45, SGI Onyx

 

 

200.2070A

Adapter: DB9F (DCE) to RJ45, HP9000, SGI Origin, IBM RS6000,

 

and PC-based Linux servers

 

 

ADP010104-01

Adapter: RJ45 rolled serial, Cisco, and Sun Netra

 

 

Note: An optional adapter for external modems is also available from Lantronix: 200.2073

Adapter: DB25M (DCE) to RJ45, external modems.

Cables:

500-184-R

Cable: RJ45 to RJ45, Cat-5, 1 Ft (.3m)

 

 

200.0063

Cable: RJ45 to RJ45, Cat-5, 6.6 ft (2 m)

 

 

500-153

Cable: RJ45 Loopback

 

 

Power Cords:

 

 

 

SLPP12310-01*

Inlet cord: IEC60320/C19 to NEMA 5-15P (15A), 8 FT.

 

 

SLPP12810-01**

Inlet cord: IEC60320/C19 to Schuko (EU), 8 Ft.

 

 

SLPP12910-01**

Inlet cord: IEC60320/C19 to BS1363 (UK), 8 Ft.

 

 

SLPP12A08-01**

Inlet cord: IEC60320/C19 to AS3112 (AUS/NZ), 8 Ft.

 

 

 

Notes: * Included with SLB088411E-01, ** Included with

 

SLB088412E-01

 

 

SLB™ Branch Office Manager User Guide

22

Page 22
Image 22
Lantronix 900-510 manual Installation, What’s in the Box