3: Installation

Relative Humidity

Operating: 10% to 90% non-condensing

 

Storage: 10% to 90% non-condensing

 

 

Heat Flow Rate

68 BTU per hour

 

 

Current measurement

± 12%

accuracy

 

 

 

1The max input/output current is de-rated to 12A when using the supplied NEMA

5-15P (15A) cable (p/n SLPP012310-01).

2The max input/output current is de-rated to 16A when using the optional NEMA

5-20P (20A) cable (p/n SLPP012410-01, SLPP012510-01, SLPP012610-01).

Physical Installation

To install the SLB branch office manager in a rack:

1. Place the SLB device in a 19-inch rack.

Warning: Be careful not to block the air vents on the sides of the SLB branch office manager. If you mount the SLB in an enclosed rack, we recommended that the rack have a ventilation fan to provide adequate airflow through the SLB.

2.Connect the serial device(s) to the SLB device ports. See on page 25.

3.Install any PC Cards you intend to use. If you install a modem card, connect to the phone line. See 9: PC Cards.

4.You have the following options:

a)To configure the SLB branch office manager using the network, or to monitor serial devices on the network, connect at least one SLB network port to a network. See Connecting to a Network Port on page 25.

b)To configure the SLB branch office manager using a dumb terminal or a computer with terminal emulation, connect the terminal or PC to the SLB console port. See Connecting a Terminal on page 25.

5.Connect the power cord, and apply power. See Connecting to a Power Source on page 26 .

6.Wait approximately a minute and a half for the boot process to complete.

When the boot process ends, the SLB host name and the clock appear on the LCD display.

Now you are ready to configure the network settings as described in 4: Quick Setup.

SLB™ Branch Office Manager User Guide

24

Page 24
Image 24
Lantronix 900-510 manual Physical Installation, To install the SLB branch office manager in a rack