Series Operation
WARNING: Explosion hazard
If the charger has been operating, wait ten minutes for any explosive battery gases to dissipate.
•Single Bank: If your system has a single bank, install both sensors on the battery (or batteries) which will be the hottest.
•Two Separate Banks: If your system has two separate battery banks, connect one sensor to either PROsine and then to the battery it is charging; connect the second sensor to the second PROsine and then to the battery it is charging.
•For additional installation details, see page
Installing the Series Sync Cable
To install the series sync cable
1.Connect the series sync cable from the SYNC jack on one PROsine to the SYNC jack on the other unit.
2.Secure the cable to prevent strain on the connections.