Bosch Appliances VG5 800 SERIES 1Attach Cover Door, Align Cover Door Hinge to Power Box

Models: VG5 800 SERIES

1 123
Download 123 pages 19.26 Kb
Page 36
Image 36

36 en Installing Roof Parapet and Pipe MountsAutoDome 800 Series HD PTZ Camera

3.3.1Attach Cover Door

1. Compress the bottom hinge pin by pushing the pin lever down and then rotate it behind the Hinge Pin Stop. The power box Cover Door provides a Hinge Pin Stop to hold the bottom hinge open while attaching the door.

90o

(FUSE)

24V NC 24V

GND TXD RXD  C+ C-

DOME

(FUSE)

HTR

 

 

(FUSE)

GND TXD RXD  C+ C-

Figure 3.2 Align Cover Door Hinge to Power Box

1

Power Supply Box

5

Hold Hinge Pin Open

2

Cover Door

6

Open Position

3

Align Top Hinge

7

Hinge Pin Stop

4

Align Bottom Hinge

 

 

2.Open the top hinge by pushing its pin lever outward and holding it open.

Note: Both Hinge Pins must be fully compressed to open (unlock) the female hinges of the Cover Door before proceeding to the next step.

3.While holding the top hinge pin open, position the Cover Door to the Power Supply Box and align its hinges.

4.When the hinges are aligned, release the top hinge pin to engage its mating hinge on the power box. Then release the bottom hinge pin from the Hinge Pin Stop to complete attaching the cover door to the Power Supply Box.

NOTICE! After all wiring is complete, close the cover door and tighten the two (2) captive screws on the cover door to 10-12 N-m (90-105 in.-lbs) to ensure the Power Supply Box is watertight.

F.01U.273.797 5.0 2012.08

Installation Manual

Bosch Security Systems, Inc.

Page 36
Image 36
Bosch Appliances VG5 800 SERIES installation manual 1Attach Cover Door, Align Cover Door Hinge to Power Box