Connecting to the Storage

Zoning and connection planning in a Fibre Channel or Fibre Channel over Ethernet environment

In a fabric environment, the user should plan for the switch topology, target-to-hosts mapping, and the zone.

Planning procedure

The recommended procedure is as follows:

1.Draw the connectivity among the hosts, switch, and storage array to verify the correct fabric configuration.

2.Configure the zone capability in the switch. If connecting to EMC Connectrix, refer to the Connectrix Enterprise Storage Network System Planning Guide for information on the zone configuration.

Establishing connectivity to the storage array

Once the adapter has been properly configured, connectivity will need to be established between the adapter and the storage array. In the case, where the adapter will be directly connected to the storage array, the cable can just be attached. However, when attaching to an FC or FCoE switch, several additional configuration steps are needed.

These include zoning the port on the adapter to the correct port on the storage array, as well as configuring LUN Masking on the array.

For additional information on how to perform these additional installation steps, refer to the documentation located at E-Lab Interoperability Navigator, Topology Resource Center tab, at http://elabnavigator.EMC.com.

Note: You will need to reload the driver or reboot the server so the new targets and LUNs may be scanned and acquired by the Linux SCSI subsystem.

What next? Follow the instructions in “Device reconfiguration procedures for FC and FCoE” on page 195.

134

EMC Host Connectivity with QLogic FC and iSCSI HBAs and FCoE CNAs for the Linux Environment

Page 134
Image 134
EMC P/N 300-002-803 manual Planning procedure, Establishing connectivity to the storage array