
Procedure 6. A6 Power Supply Assembly
7.Fold the A2, A3, A4, and A5 assemblies into the analyzer as described in Procedure 5, “A2, A3, A4, and A5 Assemblies Replacement,” steps 6 through 12.
SK135
Figure
Assembly Replacement

Procedure 6. A6 Power Supply Assembly
7.Fold the A2, A3, A4, and A5 assemblies into the analyzer as described in Procedure 5, “A2, A3, A4, and A5 Assemblies Replacement,” steps 6 through 12.
SK135
Figure
Assembly Replacement