Procedure 7. A6Al High Voltage Assembly

10.Fold the A2, A3, A4, and A5 assemblies into the analyzer and secure the analyzer cover assembly as described in Procedure 5, “A2, A3, A4, and A5 Assemblies.”

3-24 Assembly Replacement