![](/images/new-backgrounds/1185470/185470185x1.webp)
4.Methods to determine node number and SP Switch port for an SP Switch Router Adapter card
5.A
6.A list of ways to verify that the SP Switch Router Adapter card is correctly installed in the SP Switch Router
7.A description of what needs to occur to bring the card online to the SP system
3.3 Installing an SP Switch Router Adapter Card
This section contains the procedure for physical installation and minimal configuration of the SP Switch Router Adapter card for use as an SP dependent node. This includes cabling the GRF to the SP CWS and the appropriate SP Switch port.
Note: There needs to be a network path between Ethernet
3.3.1 Installation Overview
IBM support personnel who install the SP Switch Router (9077) perform the physical installation and minimal configuration described below with help from the customer’s system administrator. The system administrator must complete the following basic configuration steps:
1.Locate all the components of the SP Switch Router chip group.
2.Perform the complete physical installation of the SP Switch Router unit as described in the "Power On and Initial Configuration" chapter of GRF 400/ 1600 Getting Started 1.4,
3.Perform the procedure to configure the PCMCIA disk. The procedure is included in Section 3.3.2, “Installing the PCMCIA Spinning Disk” on page 76.
Installation and Configuration | 75 |