7. Bridge the jumper wires to cross-connect from the TN 780 in A and B
carriers to the Stratum 3 clock.
8. Dress the cables down sides of the cabinet and run throu gh the cable
Slack Manager, if provided.
9. Administer the switch for the clock.
CCB01R BK-BL/21 EXTSYN1T Y-G/35
CCB01T BL-BK/22 EXTSYN1R G-Y/37
CCA02R BK-O/23 EXTSYN0T V-BL/41
CCA02T O-BK/24 EXTSYN0R BL-V/42
CCB02R BK-G/25 EXTSYN1T Y-G/35
CCB02T G-BK/26 EXTSYN1R G-Y/37
Table 23. Circuit-pack cross-connects for high or critical reliability Continued
From Stratum 3 Clock To TN780 carrier A To TN780 carrier B