Loudspeaker paging for MCC1, SCC1, CMC1, or G600
Media Gateways
Issue 4 October 2002 203555-233-116
Loudspeaker paging access without universal coupler
1. Determine port assignment of paging zone(s) from l oudspeaker paging
form.
2. At the main distribution frame, locate the connecti ng block and terminals
assigned to the selected port.
3. On the locally engineered wiring block, place a s trap between terminals S
and SZ. Place a strap between terminals S1 and SZ1 .
4. Install patch cord/jumper wires at the main distribut ion frame.
5. Connect a 2-pair line cord (modular plug at one end) f rom the information
outlet to the paging amplifier (to the loudspeake r system).
6. Install loudspeaker equipment according to the manu facturers instructions.
7. Administer the switch for the new equipment.
Loudspeaker paging with universal coupler
An information outlet provides access to lo udspeaker paging. The system side of
the main distribution frame connects to a 909A/B u niversal coupler. Make
provisions for the DC power that the 909A/B univer sal coupler requires, such as a
1151A, 1151A2, or other approved -48VDC power supply.
Six leads (T, R, SZ, SZ1, S, and S1) connect the adapter to an auxiliary trunk
circuit pack located in a port carrier.
1. Determine port assignment of paging zone(s) from l oudspeaker Paging
form.
2. Identify carrier slot and label both ends of an A25D (male to male) cable.
3. Connect a cable from the 909A/B to the system side of the main
distribution frame. A wiring block must be locally engineered.
4. Chapter 1, ‘‘909A/B universal coupler’’ provides details of the connectio ns
between the 909A/B universal coupler and the wiring b locks.
!CAUTION:
Damage to the 909A/B may occur if the cable is plug ged into J3
before all cross-connects are completed.
5. On the 909A/B universal coupler:
Connect seizure control voltage of from -9 to -70 volts to the PG2/
BZ2 connection (pin 2 of J1). Switching voltag e to the PG2/BZ2
connection can be from the 909s -48-volt supp ly.
Connect a -48 VDC power source to the -48 and GRD terminals on
the 909A/B.
6. Install patch cord/jumper wires at the main distribut ion frame.