FIGURES
xv
Cisco ONS 15454 Installation and Operations Guide
November 2001
Figure 1-1 Cisco ONS 15454 dimensions 1-6
Figure 1-2 Reversing the mounting brackets (23-inch position to 19-inch position) 1-7
Figure 1-3 Mounting an ONS 15454 in a rack 1-8
Figure 1-4 A four-shelf node configuration 1-10
Figure 1-5 A four-shelf ONS 15454 Bay Assembly 1-11
Figure 1-6 The front-door erasable label 1-12
Figure 1-7 The laser warning on the front-door label 1-12
Figure 1-8 The ONS 15454 front door 1-13
Figure 1-9 Removing the ONS 15454 front door 1-14
Figure 1-10 Backplane sheet metal covers 1-15
Figure 1-11 Removing the lower backplane cover 1-16
Figure 1-12 A BNC backplane for use in 1:1 protection schemes 1-18
Figure 1-13 A High-Density BNC backplane for use in 1:N protection schemes 1-19
Figure 1-14 An SMB EIA backplane 1-20
Figure 1-15 An AMP EIA Champ backplane 1-21
Figure 1-16 Installing the BNC EIA 1-22
Figure 1-17 Installing the High-Density BNC EIA 1-23
Figure 1-18 Installing the SMB EIA (use a balun for DS-1 connections) 1-23
Figure 1-19 Installing the AMP CHAMP EIA 1-24
Figure 1-20 Installing the bottom brackets 1-26
Figure 1-21 Installing the fan-tray assembly 1-28
Figure 1-22 Ground posts on the ONS 15454 backplane 1-29
Figure 1-23 Power terminals 1-30
Figure 1-24 Pinouts 1-32
Figure 1-25 Using a right-angle connector to install coaxial cable with BNC connectors 1-37
Figure 1-26 Installing coaxial cable with SMB connectors 1-39
Figure 1-27 DS-1 electrical interface adapter (balun) 1-40
Figure 1-28 A backplane with SMB EIA for DS-1 cables 1-41
Figure 1-29 Installing cards in the ONS 15454 1-45
Figure 1-30 Installing a GBIC on an E1000-2 card 1-51
Figure 1-31 Installing fiber-optic cables 1-53