Index
IN-9
Cisco ONS 15454 Installation and Operations Guide
November 2001
H
hello interval 4-14
high-density BNC EIA
attaching coaxial cable 1-37
attaching ferrites 1-62
description 1-18
installing 1-22
hop 4-7, 4-9
hosts 3-2
hub-and-spoke 9-14
I
idle time 3-7
IEEE 802.1Q (priority queuing) 9-23
IIOP 2-12
installation
overview 1-2
AIC card 1-49
alarm wires 1-33
AMP Champ connectors 1-41
assembly specifications 1-64
baluns 1-40
BNC connectors 1-36
cables/fiber 1-52
cards 1-44
coaxial cables 1-36
coaxial cable with BNC connectors 1-37
craft interface wires 1-36
equipment required 1-3
gigabit interface converters 1-50
hardware 1-1to 1-70
LAN wires 1-35
multiple nodes 1-9
power supply 1-28
reversible mounting bracket 1-6
shelf see rack installation
single node 1-7
SMB connectors 1-38
tasks (hardware) 1-3
timing wires 1-34
warnings B-1
intermediate-path performance monitoring see IPPM
Internet Inter-ORB Protocol see IIOP
internet protocol see IP
interoperability
JRE compatibility 2-2
ONS node Ethernet circuit combinations 9-5
software and hardware matrix 1-68
inventory 3-18
IP
address change for LAN connection 2-7
address definition 3-2
address description 2-5
addressing scenarios see IP addressing scenarios 4-2
default address 2-5
environments 4-1
networking 4-1to 4-17
OSPF see OSPF
requirements 4-2
select address for log in 2-10
subnetting 4-1
IP addressing scenarios 4-2
CTC and nodes connected to router 4-3
CTC and nodes on same subnet 4-2
default gateway on CTC workstation 4-6
OSPF 4-10
Proxy ARP and gateway 4-4
static route for multiple CTC workstations 4-9
static routes connecting to LANs 4-6
IPPM
description 8-10
provisioning 7-24
J
J1 bytes 6-12