TABLES
xxiii
Cisco ONS 15454 Installation and Operations Guide
November 2001
Table 1 -1 Installation Tasks 1-3
Table 1 -2 External Timing Pin Assignments for BITS 1-34
Table 1 -3 LAN Pin Assignments 1-35
Table 1 -4 Craft Interface Pin Assignments 1-35
Table 1 -5 Pin Assignments for AMP Champ Connectors (Shaded Area Corresponds to White/Orange Binder
Group) 1-41
Table 1 -6 Pin Assignments for AMP Champ Connectors (shielded DS1 cable) 1-42
Table 1 -7 Slot and Card Symbols 1-46
Table 1 -8 Card Ports, Line Rates, and Connectors 1-46
Table 1 -9 LED Activity during TCC+ and XC/XCVT/XC10G Card Installation 1-48
Table 1 -10 LED Activity during Optical and Electrical Card Installation 1-49
Table 1 -11 Installation Checklist 1-67
Table 1 -12 ONS 15454 Software and Hardware Compatibility 1-68
Table 2 -1 JRE Compatibility 2-2
Table 2 -2 Computer Requirements for CTC 2-3
Table 2 -3 Setting Up Windows 95/98, Windows NT, and Windows 2000 PCs for Direct ONS 15454 Connections 2-6
Table 2 -4 Node View Card Colors 2-14
Table 2 -5 Node View Tabs and Subtabs 2-15
Table 2 -6 Node Status 2-16
Table 2 -7 Performing Network Management Tasks in Network View 2-17
Table 2 -8 Managing Domains 2-19
Table 2 -9 CTC Window Navigation 2-23
Table 2 -10 Table Display Options 2-25
Table 2 -11 Table Data with Export Capability 2-26
Table 3 -1 ONS 15454 Security LevelsNode View 3-6
Table 3 -2 ONS 15454 User Idle Times 3-7
Table 3 -3 Protection Types 3-9
Table 3 -4 SSM Generation 1 Message Set 3-14
Table 3 -5 SSM Generation 2 Message Set 3-14
Table 4 -1 General ONS 15454 IP Networking Checklist 4-2
Table 4 -2 Sample Routing Table Entries 4-16
Table 5 -1 ONS 15454 Rings 5-1