1-4
Cisco ONS 15454 Installation and Operations Guide
November 2001
Chapter1 Hardware Installation
Installation Equipment
1.2.1 Included Materials
The following materials are required and are shipped w ith the ON S 1 545 4. Th e num be r in p ar ent heses
gives the quantity of the item included in the package.
#12-24 x 3/4 pan head phillips mounting screws (8)
#12 -24 x 3/4 socket set screws (2)
T-handle #12-24 hex tool for set screws (1)
ESD wrist strap with 1.8 m (6 ft) coil cable (1)
Tie wraps (10)
Pinned Allen key for front door (1)
Spacers (4)
Spacer mounting brackets (2)
Clear plastic rear cover (1)
Bottom brackets for the fan-tray air filter
1.2.2 User-Supplied Materials
The following materials and tools are required but are n ot su ppl ied wi th the O NS 154 54.
Equipment rack (22 inches total width for a 19-inch rack; 26 inches total width for a 23-inch rack)
Fuse panel
Power cable (from fuse and alarm panel to assembly), #10 AWG, copper conductors, 194°F [90°C])
Ground cable #6 AWG stranded
Alarm cable pairs for all alarm connections, #22 or #24 AWG, solid tinned
Shielded Building Integrated Timing Supply (BITS) clock cable pair #22 or # 24, so lid ti nned
Single mode SC fiber jumpers with UPC polish (55 dB or better) for optical cards
Shielded coaxial cable terminated with SMB or BNC connectors for DS-3 cards
Shielded ABAM cable terminated with AMP Champ connectors or unterminated for DS-1 cards
with #22 or #24 AWG ground wire (typically about two feet in length)
Tie wraps and/or lacing cord
Labels
Listed pressure terminal connectors such as ring and fork types; connectors must be suitable for
10AWG copper conductors

1.2.2.1 Tools Needed

#2 phillips screw driver
Medium slot head screw driver
Small slot head screw driver
Wire wrap p er
Wire cutters