Contents
iv
Cisco ONS 15454 Installation and Operations Guide
November 2001
Procedure: Open the Front Cabinet Compartment (Door) 1-12
Procedure: Remove the Front Door 1-13
1.5 Backplane Access 1-14
Procedure: Remove the Backplane Sheet Metal Covers 1-15
1.5.1 Lower Backplane Cover 1-15
Procedure: Remove the Lower Backplane Cover 1-16
1.5.2 Alarm Interface Panel 1-16
1.6 EIA Installation 1-17
1.6.1 BNC EIA 1-17
1.6.2 High-Density BNC EIA 1-18
1.6.3 SMB EIA 1-19
1.6.4 AMP Champ EIA 1-20
Procedure: Install a BNC, High-Density BNC, or SMB EIA 1-22
Procedure: Install the AMP Champ EIA 1-24
1.7 Fan-Tray Assembly Installation 1-25
Procedure: Install the Bottom Brackets and Air Filter 1-26
Procedure: Install the Fan-Tray Assembly 1-27
1.8 Power and Ground Installation 1-28
Procedure: Install Redundant Power Feeds 1-30
1.9 Alarm, Timing, LAN, and Craft Pin Connections 1-3 2
1.9.1 Alarm Installation 1-33
Procedure: Install Alarm Wires on the Backplane 1-33
1.9.2 Timing Installation 1-33
Procedure: Install Timing Wires on the Backplane 1-34
1.9.3 LAN Installation 1-34
Procedure: Install LAN Wires on the Backplane 1-35
1.9.4 TL1 Craft Interface Installation 1-35
Procedure: Install Craft Interface Wires on the Backplane 1-36
1.10 Coaxial Cable Installation 1-36
1.10.1 BNC Connector Installation 1-36
Procedure: Install Coaxial Cable With BNC Connectors 1-36
1.10.2 High-Density BNC Connector Installation 1-37
Procedure: Install Coaxial Cable With High-Density BNC Connectors 1-38
1.10.3 SMB Connector Installation 1-38
Procedure: Install Coaxial Cable with SMB Connectors 1-38
1.11 DS-1 Cable Installation 1-39
1.11.1 Twisted Pair Wire-Wrap Installation 1-39
Procedure: Install DS-1 Cables Using Electrical Interface Adapters (Balun) 1-40
1.11.2 AMP Champ Connector Installation 1-41