Cisco Systems MDS 9500 Series manual Site Preparation Checklist

Models: MDS 9500 Series

1 288
Download 288 pages 59.22 Kb
Page 268
Image 268

Appendix F Site Planning and Maintenance Records

Site Preparation Checklist

Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m .

Site Preparation Checklist

Planning the location and layout of your equipment rack or wiring closet is essential for successful switch operation, ventilation, and accessibility. Table F-1lists the site planning tasks that Cisco recommends completing before installing the Cisco MDS 9500 Series.

Consider heat dissipation when sizing the air-conditioning requirements for an installation. See

Table D-1 on page D-1for the environmental requirements. See the“Power Specifications for the Cisco MDS 9513 Director” section on page D-6, the “Power Specifications for the Cisco MDS 9509 Director” section on page D-9, and the “Power Specifications for the Cisco MDS 9506 Director” section on page D-14for power and heat ratings.

 

 

 

 

Table F-1

 

Site Planning Checklist

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Task No.

Planning Activity

Verified By

Time

Date

 

 

 

 

 

 

 

1

Space evaluation:

 

 

 

 

 

 

 

 

 

Space and layout

 

 

 

 

 

 

 

 

 

Floor covering

 

 

 

 

 

 

 

 

 

Impact and vibration

 

 

 

 

 

 

 

 

 

Lighting

 

 

 

 

 

 

 

 

 

Maintenance access

 

 

 

 

 

 

 

 

 

 

 

2

Environmental evaluation:

 

 

 

 

 

 

 

 

 

Ambient temperature

 

 

 

 

 

 

 

 

 

Humidity

 

 

 

 

 

 

 

 

 

Altitude

 

 

 

 

 

 

 

 

 

Atmospheric

 

 

 

 

 

 

 

 

 

 

contamination

 

 

 

 

 

 

 

 

 

Air flow

 

 

 

 

 

 

 

 

 

 

 

3

Power evaluation:

 

 

 

 

 

 

 

 

 

Input power type

 

 

 

 

 

 

 

 

 

Power receptacles (20 A)1

 

 

 

 

 

 

 

 

 

Receptacle proximity to

 

 

 

 

 

 

 

 

 

 

the equipment

 

 

 

 

 

 

 

 

 

Dedicated (separate)

 

 

 

 

 

 

 

 

 

 

circuits for redundant

 

 

 

 

 

 

 

 

 

 

power supplies

 

 

 

 

 

 

 

 

 

UPS2 for power failures

 

 

 

 

 

 

 

 

 

DC systems: proper gauge

 

 

 

 

 

 

 

 

 

 

wire and lugs

 

 

 

 

 

 

 

 

 

 

 

4

Grounding evaluation:

 

 

 

 

 

 

 

 

 

Circuit breaker size

 

 

 

 

 

 

 

 

 

CO ground (AC- and

 

 

 

 

 

 

 

 

 

 

DC-powered systems)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cisco MDS 9500 Series Hardware Installation Guide

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F-4

 

 

 

 

 

 

 

OL-17467-02

 

 

 

 

 

 

 

 

 

 

Page 268
Image 268
Cisco Systems MDS 9500 Series manual Site Preparation Checklist, Task No Planning Activity Verified By Time Date