Appendix F Site Planning and Maintenance Records
Site Preparation Checklist
Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m .
Site Preparation Checklist
Planning the location and layout of your equipment rack or wiring closet is essential for successful switch operation, ventilation, and accessibility. Table
Consider heat dissipation when sizing the
Table
|
|
|
| Table |
| Site Planning Checklist |
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
| Task No. | Planning Activity | Verified By | Time | Date | ||
|
|
|
|
|
|
| ||||
1 | Space evaluation: |
|
|
|
| |||||
|
|
|
|
| • | Space and layout |
|
|
|
|
|
|
|
|
| • | Floor covering |
|
|
|
|
|
|
|
|
| • | Impact and vibration |
|
|
|
|
|
|
|
|
| • | Lighting |
|
|
|
|
|
|
|
|
| • | Maintenance access |
|
|
|
|
|
|
|
|
|
|
| ||||
2 | Environmental evaluation: |
|
|
|
| |||||
|
|
|
|
| • | Ambient temperature |
|
|
|
|
|
|
|
|
| • | Humidity |
|
|
|
|
|
|
|
|
| • | Altitude |
|
|
|
|
|
|
|
|
| • | Atmospheric |
|
|
|
|
|
|
|
|
|
| contamination |
|
|
|
|
|
|
|
|
| • | Air flow |
|
|
|
|
|
|
|
|
|
|
| ||||
3 | Power evaluation: |
|
|
|
| |||||
|
|
|
|
| • | Input power type |
|
|
|
|
|
|
|
|
| • Power receptacles (20 A)1 |
|
|
|
| |
|
|
|
|
| • | Receptacle proximity to |
|
|
|
|
|
|
|
|
|
| the equipment |
|
|
|
|
|
|
|
|
| • | Dedicated (separate) |
|
|
|
|
|
|
|
|
|
| circuits for redundant |
|
|
|
|
|
|
|
|
|
| power supplies |
|
|
|
|
|
|
|
|
| • UPS2 for power failures |
|
|
|
| |
|
|
|
|
| • DC systems: proper gauge |
|
|
|
| |
|
|
|
|
|
| wire and lugs |
|
|
|
|
|
|
|
|
|
|
| ||||
4 | Grounding evaluation: |
|
|
|
| |||||
|
|
|
|
| • | Circuit breaker size |
|
|
|
|
|
|
|
|
| • CO ground (AC- and |
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
| Cisco MDS 9500 Series Hardware Installation Guide |
|
|
|
| |||
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|