Appendix F Site Planning and Maintenance Records
Site Preparation Checklist
Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m .
Table |
| Site Planning Checklist (continued) |
|
| |
|
|
|
|
| |
Task No. | Planning Activity | Verified By | Time | Date | |
|
|
|
|
| |
5 | Cable and interface equipment |
|
|
| |
| evaluation: |
|
|
| |
| • | Cable type |
|
|
|
| • | Connector type |
|
|
|
| • | Cable distance limitations |
|
|
|
| • | Interface equipment |
|
|
|
|
| (transceivers) |
|
|
|
|
|
|
|
| |
6 | EMI3 evaluation: |
|
|
| |
| • | Distance limitations for |
|
|
|
|
| signaling |
|
|
|
| • | Site wiring |
|
|
|
| • | RFI4 levels |
|
|
|
1.Verify that each power supply installed in the chassis has a dedicated AC source or DC source circuit.
2.UPS = uninterruptible power supply
3.EMI = electromagnetic interference
4.RFI = radio frequency interference
Cisco MDS 9500 Series Hardware Installation Guide
|
| |
|