Cisco Systems MDS 9500 Series manual Cable Retention on the Power Supply

Models: MDS 9500 Series

1 288
Download 288 pages 59.22 Kb
Page 109
Image 109

Chapter 2 Installing the Cisco MDS 9500 Series

Starting Up the Switch

Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m .

Providing Power to an AC Power Supply for the Cisco MDS 9513 Director

To provide power to an AC power supply in a Cisco MDS 9513 Director, follow these steps:

Step 1 Plug the power cable into the power supply, and tighten the screw on the cable retention device to ensure that the cable cannot be pulled out. Each power supply has two AC power connections (as shown in Figure 2-15).

Figure 2-15 Cable Retention on the Power Supply

1

144528

2 2

1

Power switch

2

Cable retention

Step 2 Connect the other end of the power cable to an AC power source.

Step 3 Turn the power switch to the on () position on the power supply.

Step 4 Verify power supply operation by checking that the power supply LEDs are in the following states:

INPUT OK LEDs are green.

FAN OK LEDs are green.

OUTPUT FAIL LED is off.

See Table 1-2 on page 1-11for power supply LED details.

 

 

Cisco MDS 9500 Series Hardware Installation Guide

 

 

 

 

 

 

OL-17467-02

 

 

2-29

 

 

 

 

 

Page 109
Image 109
Cisco Systems MDS 9500 Series manual Cable Retention on the Power Supply