
Chapter 2 Installing the Cisco MDS 9500 Series
Removing and Installing a Power Supply or PEM
Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m .
Caution Use both hands to install and remove power supplies. Each power supply weighs 34.2 lbs (15.5 kg).
Step 5 Grasp the power supply handles and slide the power supply partially out of the chassis, about four to five inches. (See Figure
Step 6 If the power supply is at your waist or chest level, place your other hand underneath the power supply and slide the power supply completely out of the chassis. Use the two front handles if you are comfortable doing so.
Note There is a handle at the top rear of the power supply you can also use to lift the power supply out of the chassis.
Figure 2-28 Handling a Power Supply for the Cisco MDS 9513 Director
144529
Step 7 If the power supply is above your waist or chest height, use the lower front handle on the face plate and the other hand underneath the power supply. Assure adequate support with both hands on the unit at the designated support points, and slowly pull the power supply out of the chassis so that the weight of the unit will be fully supported once it is removed.
|
| Cisco MDS 9500 Series Hardware Installation Guide |
|
| |
|
|
| |||
|
|
|
| ||
|
|
|
|