Chapter 2 Installing the Cisco MDS 9500 Series
System Grounding
Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m .
To install the Cisco MDS 9506 chassis in the rack using the
Step 1 Place all the parts and screwdrivers near the rack for easy access while attaching the switch to the rack.
Note The front
Step 2 Position a person at each side of the chassis. Grasp the bottom of the chassis and slowly lift the chassis in unison, avoiding sudden twists or moves to prevent injury. Insert the rear of the chassis between the front mounting rails (see Figure
Step 3 If you are installing the optional cable management bracket, align the holes in the cable management bracket with the holes in the front, right
Note Because the fan tray is on the left side of the chassis, Cisco recommends using only the right side for cable management. This allows easy removal of the fan tray if you need to replace a fan.
Step 4 Align the holes in the front
Caution Use a minimum of four screws per side to ensure that the switch is adequately supported by the front
System Grounding
This section describes the need for system grounding and explains how to prevent damage from electrostatic discharge.
Proper Grounding Practices
Grounding is one of the most important parts of equipment installation. Proper grounding practices ensure that the buildings and the installed equipment within them have
|
| Cisco MDS 9500 Series Hardware Installation Guide |
|
| |
|
|
| |||
|
|
|
| ||
|
|
|
|