Chapter 2 Installing the Cisco MDS 9500 Series
Removing and Installing a Power Supply or PEM
Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m .
Figure 2-30 Handling a Power Supply for the Cisco MDS 9509 Director
91687
Installing an AC Power Supply in the Cisco MDS 9509 Director
The procedure for installing an AC power supply in the Cisco MDS 9509 Director is the same for the
Caution Use both hands to install and remove power supplies. Each Cisco MDS 9509 AC power supply weighs up to 28 lb (12.6 kg). The
To install an AC power supply in the Cisco MDS 9509 Director, follow these steps:
Step 1 Ensure that the system (earth) ground connection has been made. See the “System Grounding” section on page
Step 2 If a filler panel is installed, remove the filler panel from the power supply bay by loosening the captive screw.
|
| Cisco MDS 9500 Series Hardware Installation Guide |
|
| |
|
|
| |||
|
|
|
| ||
|
|
|
|