Cisco Systems MDS 9500 Series manual Installing an AC Power Supply in the Cisco MDS 9509 Director

Models: MDS 9500 Series

1 288
Download 288 pages 59.22 Kb
Page 137
Image 137

Chapter 2 Installing the Cisco MDS 9500 Series

Removing and Installing a Power Supply or PEM

Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m .

Figure 2-30 Handling a Power Supply for the Cisco MDS 9509 Director

91687

Installing an AC Power Supply in the Cisco MDS 9509 Director

The procedure for installing an AC power supply in the Cisco MDS 9509 Director is the same for the 4000-W, 3000-W, and 2500-W power supplies, except that the power cable for the 4000-W power supply is hardwired to the power supply.

Caution Use both hands to install and remove power supplies. Each Cisco MDS 9509 AC power supply weighs up to 28 lb (12.6 kg). The 4000-W and 2500-W power supplies weigh up to 28 lb (12.6 kg). The 3000-W power supply weighs up to 24 lb (11 kg).

To install an AC power supply in the Cisco MDS 9509 Director, follow these steps:

Step 1 Ensure that the system (earth) ground connection has been made. See the “System Grounding” section on page 2-17.

Step 2 If a filler panel is installed, remove the filler panel from the power supply bay by loosening the captive screw.

 

 

Cisco MDS 9500 Series Hardware Installation Guide

 

 

 

 

 

 

OL-17467-02

 

 

2-57

 

 

 

 

 

Page 137
Image 137
Cisco Systems MDS 9500 Series manual Installing an AC Power Supply in the Cisco MDS 9509 Director