Cisco Systems MDS 9500 Series manual Installing an AC PEM, Installing a DC PEM

Models: MDS 9500 Series

1 288
Download 288 pages 59.22 Kb
Page 146
Image 146

Chapter 2 Installing the Cisco MDS 9500 Series

Removing and Installing a Power Supply or PEM

Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m .

Installing an AC PEM

To install an AC PEM in a Cisco MDS 9506 chassis, follow these steps:

Step 1 Ensure that the system (earth) ground connection has been made. See the “System Grounding” section on page 2-17.

Step 2 If a filler panel is installed, remove it from the PEM bay by loosening the captive screws and pulling it from the chassis.

Step 3 Slide the PEM into the PEM bay, ensuring that the PEM is fully seated in the bay.

Step 4 Tighten the PEM captive screws to 8 in-lb.

Step 5 Provide power to the PEM as described in the “Providing Power to an AC Power Supply for the Cisco MDS 9509 and Cisco MDS 9506 Directors” section on page 2-30.

Caution In a system with dual power supplies, connect each power supply to a separate power source. In case of a power source failure, the second source will most likely still be available.

Step 6 Verify PEM and power supply operation by checking the power supply LED states in the back of the chassis:

INPUT OK LED is green.

FAN OK LED is green.

OUTPUT FAIL LED is off.

Installing a DC PEM

To install a DC PEM in a Cisco MDS 9506 chassis, follow these steps:

Step 1 Ensure that the system (earth) ground connection has been made. See the “System Grounding” section on page 2-17.

Step 2 If a filler panel is installed, remove it from the PEM bay by loosening the captive screws and pulling it from the chassis.

Step 3 Attach the DC power cables to the PEM as described in “Providing Power to a DC Power Supply in the Cisco MDS 9506 Director” section on page 2-34.

Step 4 Slide the PEM into the PEM bay, ensuring that the PEM is fully seated in the bay.

Step 5 Tighten the PEM captive screws to 8 in-lb.

Caution In a system with dual power supplies, connect each power supply to a separate power source. In case of a power source failure, the second source will most likely still be available.

Step 6 Verify PEM and power supply operation by checking the power supply LED states in the back of the chassis:

INPUT OK LED is green.

FAN OK LED is green.

 

Cisco MDS 9500 Series Hardware Installation Guide

2-66

OL-17467-02

Page 146
Image 146
Cisco Systems MDS 9500 Series manual Installing an AC PEM, Installing a DC PEM