Managing Network Adapters

Toggling the Locator LED for a Physical Drive

Procedure

 

Command or Action

Purpose

Step 1

Server# scope chassis

Enters the chassis command mode.

Step 2

Server /chassis # scope storageadapter slot

Enters command mode for an installed storage

 

 

card.

Step 3

Server /chassis/storageadapter # scope bbu

Enter the battery backup unit command mode.

Step 4

Server /chassis/storageadapter #

Starts the learn cycle for the battery.

 

start-learn-cycle

 

This example shows how to initiate the learn cycles for a battery:

Server # scope chassis

Server /chassis # scope storageadapter SLOT-2

Server /chassis/storageadapter # scope bbu

Server /chassis/storageadapter/bbu # start-learn-cycle

Server /chassis/storageadapter/bbu #

Toggling the Locator LED for a Physical Drive

Before You Begin

You must be logged in as an admin to perform this task.

Procedure

 

Command or Action

Purpose

Step 1

Server# scope chassis

Enters the chassis command mode.

Step 2

Server /chassis # scope storageadapter slot

Enters command mode for an installed

 

 

storage card.

Step 3

Server /chassis/storageadapter # scope

Enters the physical drive command mode.

 

physical-drive 3

 

Step 4

Server /chassis/storageadapter/physical-drive

Enables or disables the physical drive locator

 

# locator-led {on off}

LED.

This example shows how to enable the locator LED for physical drive 3:

Server # scope chassis

Server /chassis # scope storageadapter SLOT-2

Server /chassis/storageadapter # scope physical-drive 3

Server /chassis/storageadapter/physical-drive # locator-led on

Server /chassis/storageadapter/physical-drive* # commit

Server /chassis/storageadapter/physical-drive #

 

Cisco UCS C-Series Servers Integrated Management Controller CLI Configuration Guide, Release 1.5

126

OL-28893-01

Page 142
Image 142
Cisco Systems UCSCPCIEBTG, 57712 manual Toggling the Locator LED for a Physical Drive, Start-learn-cycle, Physical-drive